SECTION 27: FIREWALL: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
| Line 12: | Line 12: | ||
==== Step 7 ====  | ==== Step 7 ====  | ||
Note when riveting F-1001M Left Side Angle, you need to leave the 2  holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2  | Note when riveting F-1001M Left Side Angle, you need to leave the 2  holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2  | ||
== PAGE 27-4 ==  | |||
Step 8: if you are planning to use the Andair fuel selector you might want to hold off riveting the F-1048C-1 Fuel Valve Bracket to the fwd fuselage ribs, as the Andair selector does not fit this bracket.  | |||
Revision as of 12:37, 27 July 2022
Build Instruction Updates
- N/A
 
Check for more recent updates here
PAGE 27-2
- For additional info, see also section QB_Fuselage
 - Plan your control cables pass-throughs at step 3
 - Some people have used an "eyeball" type here that may require different spacing than the pre-punched holes provided in the kit.
Many use these for the control cable penetrations (at Spruce: EYEBALL FIREWALL FITTING- SS PRESSURE PLATE - STEEL TTP):
 - Look ahead in the plans to see if you want to do the double plastic bushing. The RV-14 kit uses an FF-00001 to penetrate the firewall:

 - Many people have used the following pass-thru with the RV-10 (at Spruce: Avery SS Firewall Pass-Thru):

 
Step 7
Note when riveting F-1001M Left Side Angle, you need to leave the 2 holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2
PAGE 27-4
Step 8: if you are planning to use the Andair fuel selector you might want to hold off riveting the F-1048C-1 Fuel Valve Bracket to the fwd fuselage ribs, as the Andair selector does not fit this bracket.