SECTION 14: WING RIBS: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
| Line 1: | Line 1: | ||
== Page 14-05 ==  | == Page 14-05 ==  | ||
* Several builders report callouts on page 14-05 with the wrong number of rivets to attach the ribs to the spar: Innermost rib needs 6 instead of 5 rivets, the   | * Several builders report callouts on page 14-05 with the wrong number of rivets to attach the ribs to the spar: Innermost rib needs 6 instead of 5 rivets, the 2 ribs inside the outmost rib need 8 instead of 4 rivets. See FB post [https://www.facebook.com/groups/vansaircraftbuilders/posts/10166426530055525 3/28/2022] and VAF thread [https://vansairforce.net/community/showthread.php?t=135926 3/20/2016]  | ||