SECTION 15: REAR SPAR: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
m (→Page 15-5)  | 
				|||
| Line 3: | Line 3: | ||
== Page 15-5 ==  | == Page 15-5 ==  | ||
Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions).  | * Step 1: 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges   | ||
* Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions).  | |||
Revision as of 04:21, 25 May 2022
Page 15-2
Page 15-5
- Step 1: 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges
 - Read through the Service Bulletin SB-16-03-28 to better understand the assembly (ignore the drill-out instructions).