SECTION 15: REAR SPAR: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
m (→Page 15-2)  | 
				|||
| Line 1: | Line 1: | ||
=== Build Instruction Updates ===  | === Build Instruction Updates ===  | ||
*   | * 10/05/21 [https://www.vansaircraft.com/wp-content/uploads/2021/10/15_10.pdf 15_10.pdf]  | ||
== Page 15-2 ==  | == Page 15-2 ==  | ||
Revision as of 05:36, 12 June 2022
Build Instruction Updates
- 10/05/21 15_10.pdf
 
Page 15-2
Page 15-5
- Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges 
 

 - Read through the Service Bulletin SB-16-03-28 to better understand the assembly (ignore the drill-out instructions).
 - See also FB post 6/9/2022